8/25/1966: Launching a nuclear submarine, the submarine project 667A.
Minister advocates the shipbuilding industry Butoma BE
Acts Admiral Kasatonov IV
Pass commission members.
Military band played.
Those present at the ceremony.
Submarine in dry dock.
Submarine goes into the Northern Dvina.
Submarine moored to a pier.
The building of the Leningrad Design Bureau "Rubin" in Leningrad.
The work of employees of CB "Rubin".
Sitting in Bank "Rubin".
Chief Designer SN Kovalev, a drawing of submarine.
Construction of the submarine at Sevmash.
HE Egorov and co-workers considers the drawings the submarine.
Egorov E.P. -- constructor
Kovalev S.N.
Butoma B.E. -- Minister of Shipbuilding Industry
Kasatonov I.V. -- admiral
1964-1966
Leningrad, Severodvinsk
Scientific Council, Design Office, Descent subs on the water, Sevmash, Submarine "Navaga"
Floating submarine.
Officers at the console of the submarine.
The interior of the submarine.
The main command post submarines, a portrait of Lenin.
The various control panels submarine.
Details of submarine.
Cabin personnel, dispensary.
Dining, Campus.
Clinic.
Assembly plant Sevmash.
Construction of the submarine.
02.1974: Descent subs on the water.
Submarine at sea, dive into the depths.
Military on the submarine.
Alarm.
Raising and lowering mast devices.
Closes the hatch.
The officers took seats at the board.
Handles on the remote.
An officer with the drawings.
Officers at the console.
Missile launching from the submarine.
Rises the submarine.
1974-1976
Severodvinsk
Nuclear submarine, Sevmash, Missile launching
Floats submarine.
Details of the submarine.
General Designer CKB Rubin Kovalev in the assembly shop.
Assembly shops.
Derivation of the submarine at depth.
The submarine, floating.
The interior of the submarine: the galley, dining room, appliances.
Prelaunch.
Launching missiles from a submarine.
Awarding the creators of Project 667-BDR.
Submarine to the shore.
Kovalev, SN - Chief designer CKB Rubin
1978
Nuclear submarine, Design Bureau, Rewarding
Floats submarine.
Details of the submarine.
General Designer CKB Rubin Kovalev in an office with employees.
Constructors to the drawing board-Kuhlmann.
Laboratory, shop, work, tests.
Welding, assembly.
08.1972: The solemn launching the first boat 667B. Raising the flag of the USSR Navy.
Command post.
The officers dined on a submarine.
Prelaunch.
Launching missiles from a submarine.
Kovalev, SN - Chief designer CKB Rubin
1972-1974
Nuclear submarine, Design Bureau
Submarine in the port of Severodvinsk.
The solemn flag-raising ceremony of the Navy: Navy Command representatives and creators of subs coming on board, read out an order to lift the flag, Captain 1st Rank Berezovsky raises a flag.
Submarine before sailing into the port.
The boat leaves the canal waters in the open sea.
Submarine in the sea.
Dive the submarine.
The central position the submarine war in the console.
Operators at the central control submarine.
The various control panels submarine.
Surfacing submarine.
Bays subs: wardroom officers, canteen personnel, military submarine in the gym.
Medical check-up on the submarine.
Campus submarine.
Cabins.
Submarine in the sea.
Open the silos submarine.
Alarm on a submarine.
Dive the submarine.
The device is "Depth".
Officers at the console.
The buttons on the remote.
Preparing to launch rockets.
Operator enters the punch card.
Light up the buttons on the remote.
Start.
Missiles fly out of the water.
Missiles in the air.
Rises the submarine.
Test participants on a submarine.
Submarine in the sea.
Tests of the submarine
1966-1967
Severodvinsk
The launch, Submarine "Navaga"