Phased reconstruction firstborn Siberian metallurgy (1986)

Movie №40661, 2 parts, Duration: 0:17:05
Studio Sverdlovsk newsreel studio
Directors:
M.Geller
Camera operators:
Kochusov
Screenwriters:
Komarovsky
Composers:
Suslov

Annotation

The film describes the restoration of the Guryev Metallurgic Works.

Reel №1

Footage frameFootage frameFootage frameFootage frame

Landscape.

The city of Guryev.

E.J. Klassen (synchronously).

The head of the rolling shop A.M.Vorobey (synchronously).

Photos of the workshops of the plant before reconstruction.

B.V. Ivanov (synchronously).

Rolling shop.

Design bureau.

Drawings.

Works on the reconstruction of the plant (photos).

Rolling mill.

New buildings of the plant (photo).

Finished products.

Persons

Klassen Ivanov

Shooting locations:

Guryev

Objects:

Guryev Metallurgical Plant

Reel №2

Footage frameFootage frameFootage frameFootage frame

Ball rolling complex.

E.J.Klassen-Director of the Guryev plant (synchronously).

The old foundry building, built in 1846 (photo).

Reconstruction works (photo).

Taking a metal sample.

Pouring metal into the bucket.

Coking conveyor.

Foundry shop.

Meeting with the director (synchronously).

Hardware shop.

Rolling shop.

General view of the Guryev Metallurgical Plant.

Shooting locations:

Kemerovo region [780]

Objects:

Guryev Metallurgical Plant